Your choice is saved in your browser.
What's Inside
LaserLock isn't a rebadged living-room laser game. It's a training platform built for serious shooters — real distances, real environments, and drills that are difficult or impossible to run any other way. Every feature exists to make your sessions productive and measurable.
Real-time computer vision locates your laser dot on any target with sub-second response.
Every shot logged, plotted and scored. Group size, mean point of impact in cm and MOA, fatigue trend, bias clock, split times and laser health — for every set and the whole session. See the analytics ↓
Draw-to-fire precision timer with audio cue. Track split times between shots.
IDPA, USPSA, bullseye, threat silhouette. On-screen or printable.
Guided sessions for trigger control, draw fundamentals, failure drills.
Compatible with most 9mm, .40, .45, .380 laser cartridges.
Your last sessions per drill on one chart — score, group size and grade — with a personal-best line that flags every new record.
Core training works on-device. No account required. Your data stays yours.
Fluorescent, Flash & Thunderbolt drills — train muscle memory and target prediction in the dark. Unique to LaserLock as far as we are aware.
Duo Mode + smart ROI: handgun drills tested at 30–50 m and rifle drills up to 100 m — real depth perception, zero ammo cost.
Coaching Analytics
After every set and every session LaserLock builds a full analysis — grouping maths, fatigue trend, bias direction, split times and laser health — then turns it into plain-English coaching you can save as a PDF or share as an image. Everything below is a real screen from the app.








Twelve-sector miss direction with the matching coaching cue — heeling, jerking, grip tension and more.
Accuracy, precision, consistency, speed, discipline and endurance on one radar.
Save the PDF to your device or send it straight to your coach — you choose where it goes. Nothing is uploaded unless you share it.
Hit a personal best? Share a card with your grade, score and group to social media. Add a selfie and your name if you like — leave them off and the card stays anonymous while still showing what you achieved.
Every Range Is Different
Lighting, distance, target material, camera hardware — no two training spots are alike. Apps that only work "out of the box" work for some people and fail silently for everyone else. LaserLock takes the opposite path: sensible defaults that just work, plus a full set of adjustment knobs in your hands when your environment demands them — organised so you're never flooded with settings you don't need.
Guided calibration, adjustable ROI zone, sensitivity and adaptation controls — dial detection to your lighting and camera instead of hoping the defaults fit.
Size, shape and ring count per target. Side-by-side arrays or distance-separated targets within one frame. Even a mannequin or any 3D object can become a scored target.
Wind parameters for simulated long-range work, friendly/no-shoot targets, called multi-target switching, and rescue-scenario drills — realism scales with your skill.
Go Deeper
Fluorescent, Flash & Thunderbolt — a dark-room training method we believe is the first of its kind, explained in full.
Read the science →
Moving targets in realistic scenes, projected, sensed and scored from one phone — no PC, no IR camera. Now with flinch analysis and two-shooter laser modes (beta).
See how it works →
How Duo Mode and smart ROI deliver tested 30–100 m outdoor sessions.
See how it works →
Called-order multi-target, Double Tap pairs, rescue scenarios and range-discipline realism.
Explore the drills →
Wind, drop, trajectory curves and MOA reporting — simulated long range.
Read the maths →
Feature-by-feature comparison — and why sensor owners should keep their hardware.
Compare now →